From consultation to install day: how long it takes

Six steps, one point of contact. Here is what happens between your first call and the moment the crew hands you the keys to your new door.

The six steps

Your project, step by step

Durations depend on product mix, your city's permit office and the factory schedule. Your consultant gives you a clear timeline before install day, and we keep you posted at every step.

  1. 1

    Free consultation

    A local consultant visits, looks at every opening, listens to what you want to fix (storm worries, noise, an old slider that sticks) and writes an itemized quote on the spot. No in-home sales theater.

    Scheduled at your convenience · length confirmed with your consultant
  2. 2

    Final measure

    Once you approve the quote, a technician takes the exact measurements the factory builds from. Every opening is measured individually; nothing is ordered off the first visit's rough numbers.

    Timing confirmed with your consultant
  3. 3

    Order & manufacturing

    Your windows and doors are custom-built for your sizes, colors and glass package. This is the longest stretch of the project and depends on the factory's current schedule.

    Most projects take 4–8 weeks from order · your consultant confirms at the free estimate
  4. 4

    Permit

    Impact window and door replacements require a building permit in Florida. Permit review runs in parallel with manufacturing, so it rarely adds time on its own. WindowWall pulls the permit and all permit fees are included in your quote.

    WindowWall pulls the permit · fees included
  5. 5

    Install day

    Our own W2 crew arrives, protects your home, removes the old units, sets and seals the new ones and cleans up. Many projects are completed in a single day; larger whole-home jobs are scheduled over consecutive days.

    Many projects completed in a single day · schedule confirmed before install
  6. 6

    Final walkthrough & warranty

    The crew lead walks every opening with you: operation, locks, screens, caulk lines. Your lifetime labor warranty plus the manufacturer's product warranty starts here, and WindowWall schedules the inspection with your city.

    WindowWall schedules the inspection
Keep it moving

Four ways to shorten your timeline

Approve the quote promptly

The factory clock starts when the order is placed, not when the consultant visits.

Pick colors and glass at the consultation

Changes after the order resets manufacturing.

Send HOA approval early

If your community requires it, start the request the week you sign. See our permits & HOA guide.

Clear access before install day

Furniture, blinds and landscaping moved in advance keeps the crew on schedule.

Install day

Many projects are completed in a single day

Our crews are employees, not subcontractors, so the same people who measured your home show up to install it. They arrive with the plan, the products and the cleanup gear.

  • Home protected with plastic before the first window comes out
  • Old units removed and hauled away the same day
  • Every opening sealed inside and out before the crew leaves
  • Walkthrough with the crew lead before sign-off
See install day in detail
Many projects are completed in a single day

Ready to start the clock?

Book your free consultation and get a clear timeline for your home.